{"id":132,"date":"2019-07-15T15:08:35","date_gmt":"2019-07-15T15:08:35","guid":{"rendered":"http:\/\/apollobautechnik.ch\/?page_id=132"},"modified":"2019-08-17T07:10:49","modified_gmt":"2019-08-17T07:10:49","slug":"fields-of-work-and-activities","status":"publish","type":"page","link":"https:\/\/apollobautechnik.ch\/en\/electrical-work\/fields-of-work-and-activities\/","title":{"rendered":"Fields of work and activities"},"content":{"rendered":"<h4><em>With us as a partner you have a competent and professional support at your side.<\/em><\/h4>\n<p><strong>Pipeline construction<\/strong><\/p>\n<ul>\n<li>Head pipeline<\/li>\n<li>Wide pipelines<\/li>\n<li>Wide tension track<\/li>\n<\/ul>\n<p><strong>Commissioning<\/strong><\/p>\n<ul>\n<li>First functional test<\/li>\n<li>Corrections<\/li>\n<li>Preparation for acceptance and inspection<\/li>\n<\/ul>\n<p><strong>Cabel reel<\/strong><\/p>\n<ul>\n<li>supply lines<\/li>\n<li>Wire \/ multi-wire<\/li>\n<li>UGV (Universal building cabling)<\/li>\n<li>T&#038;T (speedometer)<\/li>\n<li>LWL<\/li>\n<li>Compensation<\/li>\n<\/ul>\n<p><strong>UGV connections \/ control<\/strong><\/p>\n<ul>\n<li>Connect T &#038; T, UKV Multimedia<\/li>\n<li>Measurement of existing UGV systems<\/li>\n<li>Corrective action &#038; reporting<\/li>\n<li>FO &#038; POF Splices, Measurements<\/li>\n<\/ul>\n<p><strong>Installation <\/strong><\/p>\n<ul>\n<li>Lamp rails<\/li>\n<li>Individual lighting<\/li>\n<li>Distributor wiring<\/li>\n<li>HV connections<\/li>\n<\/ul>\n<p><strong>House building<\/strong><\/p>\n<ul>\n<li>Deposits<\/li>\n<li>Structural work<\/li>\n<li>Cable and wirereels<\/li>\n<li>Installations<\/li>\n<li>Functional check<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>With us as a partner you have a competent and professional support at your side. Pipeline construction Head pipeline Wide pipelines Wide tension track Commissioning First functional test Corrections Preparation for acceptance and inspection Cabel reel supply lines Wire \/ multi-wire UGV (Universal building cabling) T&#038;T (speedometer) LWL Compensation UGV connections \/ control Connect T [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":130,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"templates-pages\/page-services.php","meta":{"footnotes":""},"class_list":["post-132","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/apollobautechnik.ch\/en\/wp-json\/wp\/v2\/pages\/132","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/apollobautechnik.ch\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/apollobautechnik.ch\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/apollobautechnik.ch\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/apollobautechnik.ch\/en\/wp-json\/wp\/v2\/comments?post=132"}],"version-history":[{"count":3,"href":"https:\/\/apollobautechnik.ch\/en\/wp-json\/wp\/v2\/pages\/132\/revisions"}],"predecessor-version":[{"id":681,"href":"https:\/\/apollobautechnik.ch\/en\/wp-json\/wp\/v2\/pages\/132\/revisions\/681"}],"up":[{"embeddable":true,"href":"https:\/\/apollobautechnik.ch\/en\/wp-json\/wp\/v2\/pages\/130"}],"wp:attachment":[{"href":"https:\/\/apollobautechnik.ch\/en\/wp-json\/wp\/v2\/media?parent=132"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}